Friday, August 20, 2010
Wednesday, August 11, 2010
Riders on the Storm - Grande Finale
After reaching 1380 from the entrance in Polldeelin rising I felt that I missed the connection point. It seemed to me that trying to forge the connection from the Polltoophill Sink should be easier as in 2009 I left the end of the line in an open passage, 1070m from the entrance. Six eventfull dive over July and August finally resulted in the connection between Polltoophill in Castletown and its resurgence Polldeelin in Kiltartan. After 2.5 year and 45 dives from both sides the Riders on the Storm Traverse was completed - 2.4km in length with an average depth between 40-45m and max. -62m. Here are the log entries.
Subscribe to:
Posts (Atom)